Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Working Visit ng Pangulo sa Myanmar nagtapos na

by DWIZ 882 March 21, 2017 0 comment

Nagtapos  na ang working  visit  ni Pangulong Rodrigo Duterte sa Myanmar.

Huling  aktibidad  ng  Pangulo ang  kalahating  oras  na  pulong  nito kay  State  Counsellor Aung San Suu Kyi sa  presidential palace  sa Nay Pit Kaw.

Binigyan ng  Pangulong Duterte si  Suu Kyi  ng bouquet of  roses at  nagbigay din ito  ng  300,000 Dolyar  bilang  humanitarian support sa  Ronghiya  minority.

Inimbitahan din  ng Punong ehekutibo si  Suu Kyi na  bumisita  sa  Pilipinas  na  tinugon naman na  kanyang  ikukunsidera  ang  imbitasyon.

Matapos nito ay bumiyahe si Pangulong Duterte  patungong  Bangkok, Thailand para sa  isa  pang  working  visit.

By: Drew Nacino / Aileen Taliping

Comments

comments

You may also like

Leave a Comment