Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Windshield ng isang tren ng PNR binato, basag

by DWIZ 882 January 2, 2020 0 comment
PNR WINDSHIELD

Nabasag ang windshield ng isang tren ng Philippine National Railways (PNR) matapos itong hagisan ng bato nuong Miyerkules, Enero 1.

Ayon sa Department of Transportation (DOTr), sa Caloocan binato ang Rotem train ng PNP pasado 6 p.m.

Dahil dito, mabilis na isinailalim sa replacement ang windshield para hindi maantala ang serbisyo nito sa mga pasahero.

Kaugnay naman ng insidente, umapela ang DOTr sa mga otoridad at local govenrment unit para mahuli ang responsable sa pamamato.

Comments

comments

You may also like

Leave a Comment