Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

PNR, babagal ang takbo

by DWIZ 882 July 3, 2015 0 comment

Inaasahang bahagyang babagal ang takbo ng mga tren ng Philippine National Railways (PNR) sa pagbabalik ng operasyon nito sa susunod na linggo.

Ginawa ni PNR General Manager Joseph Allan Dilay ang pahayag kasunod nang isinagawang huling test run sa mga tren ng PNR kahapon ng umaga.

Sa test run, bumiyahe ang isang diesel multiple unit na tren mula Tutuban hanggang Alabang sa bilis na 40 kilometro kada oras (kph) lamang kaya’t inabot ng isang oras bago ito tuluyang nakarating sa Muntinlupa.

Sinabi ni Dilay na ipatutupad nila ang mas mabagal na pagpapaandar sa mga tren mula sa dating 50 kph nito para masigurong ligtas ang biyahe ng kanilang mga pasahero.

Target ng PNR na muling makabiyahe sa susunod na linggo.

By  Mariboy Ysibido     

Comments

comments

You may also like

Leave a Comment