Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Metro Manila Subway flood-proof ayon sa DOTr

by Gilbert Perdez September 4, 2020 0 comment
TUGADE 2

Ipinagmalaki ng Department of Transportation (DOTr) na flood-proof o hindi kayang sirain ng baha ang Metro Manila Subway.

Ayon kay DOTr Secretary Arthur Tugade, may karanasan sa mga bahaing lugar ang JIM Technology Corporation (JIMT) na isa sa mga Japanese contractors para sa proyekto.

Dagdag ni Tugade, mas matindi pa ang ginawa ng mga kontraktor sa Japan dahil kinailangan pa nilang ibaon ang mga tunnel hanggang sa ilalim ng dagat kung saan hanggang ngayon ay hindi ito binabaha.

Comments

comments

You may also like

Leave a Comment