Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Over parking sa NAIA ipinagbawal

by DWIZ 882 December 26, 2018 0 comment
naia

Ipinagbabawal na ang magdamagan o mahabaang oras ng pag-parada sa lahat ng pay-parking areas sa terminal three sa Ninoy Aquino International Airport (NAIA) simula Disyembre 28 hanggang Enero 3.

Ito, ayon sa Manila International Airport Authority (MIAA) ay dahil sa inaasahang mabigat na dami ng mga sasakyang maghahatid-sundo ng mga pasaherong ngayong holiday season.

Samantala, sinabi naman ng mga nangangasiwa ng NAIA na maaari pa ring pumarada sa mga pay parking areas ngunit sa limitadong oras lamang.

Comments

comments

You may also like

Leave a Comment