Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Survey na bumaba ang Pinoy na walang trabaho hindi kapanipaniwala-KMU

by DWIZ 882 September 11, 2015 0 comment

Hindi  kapani-paniwala.

Ito ang reaksyon ng Kilusang  Mayo Uno sa   ipinalabas  na survey ng Philippine Statistics Authority na   nagsasabing bumaba  sa  6.5 percent   ang   bilang ng mga walang trabaho kumpara sa 6.7 percent na   unemployment  rate noong nakaraang  taon.

Ayon kay KMU Chairperson  Elmer  Labog, salungat ito  sa  datos ng Social Weather Stations na nagpapakitang  mula   sa 19.1   percent na unemployment   rate  para sa   unang  quarter ng taong  2015 ay tumaas pa  ito sa  23.2 percent  sa ikalawang bahagi ng  taon.

Dahil dito, iginiit ni Labog na  wala  nang pinagkaiba  ang  pamahalaan sa administrasyong  Arroyo na may ugali aniyang baluktutin ang mga datos para  sa layuning  pabanguhin  ang lagay ng labor sector.

By: Ralph Obina | Aya Yupangco

Comments

comments

You may also like

Leave a Comment