Home HEADLINES TRANSMISSION LINES HIT BY MAGNITUDE 7.8 MINDANAO EARTHQUAKE FULLY RESTORED —NGCP NAIBALIK NA ANG LAHAT NG POWER TRANSMISSION LINES NA NAPINSALA NG MAGNITUDE 7.8 NA LINDOL SA SOUTHERN MINDANAO. AYON SA NATIONAL GRID CORPORATION OF THE PHILIPPINES, NAAYOS ANG SERBISYO NG POWER TRANSMISSION SA SOUTH COTABATO, SARANGANI, AT GENERAL SANTOS CITY KAHAPON, ALA-UNA TRENTA’Y OTSO. PATULOY NA MINO-MONITOR NG N.G.C.P. ANG SITWASYON SA MGA APEKTADONG LUGAR UPANG MATIYAK ANG KATATAGAN AT KALIGTASAN NG TRANSMISSION SYSTEM. NAUNA NANG INATASAN NG DEPARTMENT OF ENERGY ANG GRID OPERATOR NA PABILISIN ANG PAGSUSURI AT PAGKUKUMPUNI NG MGA NASIRANG PASILIDAD UPANG AGAD NA MAIBALIK ANG SERBISYO NG KURYENTE.

Con-Ass meeting ikakasa ng liderato ng Senado at Kamara

by DWIZ 882 August 5, 2016 0 comment
con ass

Magpupulong sa susunod na linggo ang mga lider ng Senado at Kamara para pag-usapan ang panukalang Con-Ass o constituent assembly.

Ayon kay House Majority Floorleader Rodolfo Fariñas nakipag-ugnayan na si House Speaker Pantaleon Alvarez kay Senate President Koko Pimentel para sa naturang meeting.

Sinabi ni Fariñas na tututukan sa pulong ang mga hakbangin dapat gawin para sa pagbuo ng Con-Ass.

Naniniwala naman si Fariñas na kakayanin nilang tumutok sa charter change subalit kailangang itigil muna ang kanilang legislative work.

By  Judith Larino  

Comments

comments

You may also like

Leave a Comment